We proudly serve California, Nevada, Arizona, Oregon, Texas, and Washington!

A Disabled Veteran Owned Company
A Disabled Veteran Owned Company
  • Home
  • Our Services
    • Service Overview
    • General Contracting
    • Biological and Cultural
    • Stormwater, NPDES & MS4
  • Projects
  • About
    • Learn About Us
    • Our Leadership
    • Safety
  • Contact Us
    • Contact Us
    • Careers
  • More
    • Home
    • Our Services
      • Service Overview
      • General Contracting
      • Biological and Cultural
      • Stormwater, NPDES & MS4
    • Projects
    • About
      • Learn About Us
      • Our Leadership
      • Safety
    • Contact Us
      • Contact Us
      • Careers
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Our Services
    • Service Overview
    • General Contracting
    • Biological and Cultural
    • Stormwater, NPDES & MS4
  • Projects
  • About
    • Learn About Us
    • Our Leadership
    • Safety
  • Contact Us
    • Contact Us
    • Careers

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

San Dieguito Wetland Restoration

Location:  San Diego County, CA   

Dates: November 2020


Bancroft Construction Services successfully achieved final stabilization and regulatory closure of a long standing environmental and stormwater protection project in a wetland environment, marking a significant environmental compliance milestone for the San Dieguito Wetlands. Our team installed 700 cubic yards of rainforest blend wood mulch throughout the sensitive wetland area, implementing specialized erosion control measures designed to protect water quality while supporting native habitat restoration. This complex project required precise coordination to meet California General Permit (CGP) requirements and satisfy all federal and state regulatory standards for wetland protection, including compliance with Clean Water Act provisions and regional water quality control board specifications. Through careful planning, expert execution, and close collaboration with regulatory agencies, Bancroft delivered final stabilization that allowed for the formal closure of this long-standing SWPPP, demonstrating our capability to navigate complex environmental challenges in ecologically sensitive areas while achieving measurable environmental protection outcomes.

Copyright © 2026 Bancroft Construction Services - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept